News

But for the past ten years, construction has been going on to get the 16-mile super sewer ready to carry human waste and rainwater in the new Thames Tideway Tunnel. Most of us rarely think about ...
Designed to handle storm overflows, the Thames Tideway Tunnel opened its gates today, capturing 589,000 cubic metres of sewage within 24 hours during heavy rainfall in September. The 25km ‘super ...
Construction workers walk in a completed section of the main tunnel of London’s Thames Tideway Tunnel or ‘super sewer’ (Dominic Lipinski/PA) PA Archive “The public demands Thames Water and ...
They have been used to drill the Silvertown Tunnel, Crossrail, the Power Tunnels in north London and the Thames Tideway or super sewer as well as the Channel Tunnel. Operating these machines are ...
“In addition, The Thames Tideway Tunnel has prevented 6,376,450M³ of sewage from entering the tidal Thames since it was connected earlier this year and will reduce the volume of discharges ...
Oxford were critical of the sewage levels in the River Thames in 2024 Boat Race organisers say water quality is an "ongoing concern" before Sunday's race following claims the River Thames fails ...
Thames Water has unveiled plans to launch an additional four-week consultation round on amendments to its proposed Thames Tunnel project ... No one can be in any doubt that the UK's storm water ...
It added that the Thames Tideway tunnel has prevented 6,376,450 cubic metres of sewage from entering the tidal Thames since its connection earlier this year. Thames Water believes the tunnel will ...
It added that the Thames Tideway tunnel has prevented 6,376,450 cubic metres of sewage from entering the tidal Thames since its connection earlier this year. Thames Water believes the tunnel will ...