News
Designed to handle storm overflows, the Thames Tideway Tunnel opened its gates today, capturing 589,000 cubic metres of sewage within 24 hours during heavy rainfall in September. The 25km ‘super ...
There have been “significant benefits” to the project from the lengthy process — including design improvements ... such as the new Tideway tunnel under the river Thames, according to people ...
Hosted on MSN10mon
Thames Water appoints technical partner for reservoir projectBoth organisations have supported the design and construction of London’s Thames Tideway Tunnel and are playing a key role in the design of the Fens and Lincs Reservoirs. The companies will work ...
2mon
Interesting Engineering on MSNLondon activates super sewer, stops 5 million tons of sewage from entering ThamesThe new 25km Thames Tideway Tunnel brings the entire system online to protect the tidal Thames from sewage pollution. It also ...
Construction workers walk in a completed section of the main tunnel of London’s Thames Tideway Tunnel or ‘super sewer’ (Dominic Lipinski/PA) PA Archive “The public demands Thames Water and ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results