News
The lane is scheduled to open by 7 a.m. on Thursday morning to allow free-flowing traffic over the weekend. The operation will repeat starting Sunday, July 20. This operation is part of a $27 million ...
The post Enormous — and controversial — I-26 bridge over Patton Avenue, nixed years ago, is quietly revived in Connector plan appeared first on Asheville Watchdog.
Two concrete segments protruding over I-26 will soon be close to connecting into a new Blue Ridge Parkway bridge in South Asheville.
Two concrete segments protruding over I-26 will soon be close to connecting into a new Blue Ridge Parkway bridge in South Asheville.
The bridge at Bachman Chapel Road and Interstate 26 in Newberry is closed indefinitely, according to deputies.
North Carolina Department of Transportation's I-26 widening plan requires the rebuilding of the Blue Ridge Parkway bridge.
According to troopers, a tractor-trailer carrying an excavator was traveling along I-26 when the excavator struck the bridge over the highway.
Two concrete segments protruding over I-26 will soon be close to connecting into a new Blue Ridge Parkway bridge in South Asheville.
The new bridge will be built to modern interstate standards, wide enough for three lanes plus 12-foot-wide shoulders and a minimum of at least 42-inch-high safety barrier.
The South Carolina Department of Transportation (SCDOT) will temporarily close and detour the Sunny Plain Road bridge over ...
A stretch of Interstate 26 will be closed for six hours due to overnight bridge repairs in Spartanburg County.
The Sunny Plain Road bridge over I-26 in Calhoun County will close for replacement from July 21. Detour using US 21, Caw Caw ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results